We are currently in the pre-application phase of the development.  

Given the urgency for reliable sources of renewable energy, we have ambitious targets to see a tidal lagoon constructed before 2020 and with as little delay as possible.  We believe that it is possible to have a tidal lagoon operational in Swansea Bay and powering the Grid in late 2017, although this remains subject to engineering, manufacture and connection programmes.